PILOT-STUDIES
A properly designed and executed remedial action plan REQUIRES proper feasability study. ReRem Equipment Corp. provides contract on-site services, to test and assess your clients' site-specific remediation needs. All equipment is delivered and operated by a talented OSHA & LPS trained on-site assistant, with on-board power supply. Our online inquiry form is located HERE. We provide a variety of test equipment configurations and technologies including:
Air-Sparge / Soil Vapor Extraction / High Vacuum / Dual Phase / Pump & Treat / VEGE / Phase Separation
Select ReRem-owned equipment can be trailer-mounted to address your clients' site needs, NOW. Skid-mounted components are installed in enclosed trailers to expedite delivery and increase component flexibility. Weekly or monthly rentals of common configurations will expedite your response-time.
INVENTORY APPRAISAL
We provide on-site inventory assessment and appraisal services to clients throughout the United States. Our experienced professionals will examine, label, photograph and catalog the apparent condition of your inventory to aid in the cost recovery process. This list is provided to client in CD form, with select items posted to ReRem.com for public browsing and consigned sales.
Call or email us to discuss your inventory, equipment needs or schedule a test.
NES
SVE Container
Built by National Environmental Systems <508.226.1100> (05A184) this heated / lighted / weatherized container contains a dual-SVE system with groundwater collection. PLC-controlled with independent VFD's, this high-quality package is easily modified to meet your needs.
System 1: dual-input (3" actuator controlled) with liquid transfer:
-two 3" actuators
-vacuum relief / particulate filter
-55-gallon moisture separator with level probes (pitted, needs replacement)
-1/2 HP transfer pump, G&L
-10 HP regenerative, GAST R6P155 (locked, needs replacement)
System 2: single input with liquid transfer:
-vacuum relief / particulate filter
-55-gallon moisture separator with level probes
-1/2 HP transfer pump, G&L
-10 HP regenerative, GAST R6P155 (locked, needs replacement)
NES controls (VGC):
-3 phase breaker panel
-blank face control cabinet
-IDEC PLC
-ACTech VFD's
-thermostat, +++
-CEAG IS-barriers
20' shipping container:
-3600 watt XP heater
-XP ventilation fan
-XP lighting
-insulated with plywood interior walls
Additional photos / drawings to follow.